4/n Each of the project is 135 km long with Right of Way of 100 m. WPE runs frm Kundli-Manesar-Palwal; EPE runs frm Kundli -Ghaziabad-Palwal

4/n Each of the project is 135 km long with Right of Way of 100 m. WPE runs frm Kundli-Manesar-Palwal; EPE runs frm Kundli -Ghaziabad-Palwal

Leave a Reply

Your email address will not be published. Required fields are marked *